New Builds New Build 040

Week 28

Click on any of the images below to view in more detail.

The first cabling is now being installed in the engine room 

The sea cocks have been fitted through the engine room hull plates 

Pipework is being installed to the tanks in the engine room 

Still some welding to do in the fo'c's'le 

The insulation has been fitted in the deck house 

The fridge and freezer have been fitted into the galley area 

Hydraulic pipework is being installed on the aft main deck 

Hydraulic connections have been made to the net drums on the aft main deck 

The floor joists have been fitted in the wheelhouse 

Fitting the floor panels in the wheelhouse